Tea Processing Facility
Location: Hatton, Sri Lanka
Tea Processing Facility, Hatton
Advantis Engineering designed, fabricated and erected a Pre-Engineered Steel Building, as a state-of-the-art storage facility at the project. The expansion was to complement the existing factory buildings at the premises, facilitating un-interuppted operations while expanding the storage capacity.
Project Advantages
- Customised processing areas ensure optimal workflow efficiency.
- High-strength steel structures for durability and expansion flexibility.
- Integrated energy-saving mechanisms for sustainable operations.
- Optimised ventilation and temperature control preserve tea quality.
This facility enhances productivity, ensuring the highest standards in tea processing and export quality.
Client
SCOPE
INDUSTRY
SPAN
COMPLETION
Camso Loadstar (Pvt) Ltd
Total construction (Design, Fabrication and Erection of Sub-structure and Super Structure)
Manufacturing
40,000 square feet
180 days
